Mon–Sat 9:00–19:00 (UTC+8)

Custom Artificial King Palm Tree for Airports & Transit Concourses

Application: Airports & Transit Concourses · Custom heights 4–8 m

We build custom artificial king palms for airports and transit concourses — 4–8 m specimens, NFPA 701 fire-retardant treatment available as an option, engineered per project. Transit greenery is seen by millions, engineered for public safety and cleaned by crews on a schedule. We build specimens with weld-inspected structures and documented load ratings.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
Technical Specifications

King Palm Tree Build Spec

Unit Size4–8 m, canopy 2.5–4 m
Height Range2–12 m (customizable to your photos or drawings)
TrunkFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
FoliagePE and PU materials; optional UV-resistant finish for outdoor use.
BaseSteel plate base — set in concrete or installed in a planter.
Fire RetardancyOptional NFPA 701 / BS 5867.
MaintenanceNo routine maintenance — no watering, feeding or leaf cleanup.
Lead TimeStandard builds 25–35 days; custom builds 45–60 days.
Sizing & Compliance for Airports & Transit Concourses

What This Venue Needs

Sizing

Concourse specimens run 4–12 m, hoisted in pieces through finished builds and assembled on site for the largest installations.

Compliance & Anchoring

Public-traffic rated bases, weld inspection and load documentation available on request; NFPA 701 foliage available as an option.

Project Specification

King Palm Tree specified for Airports & Transit Concourses

King Palm Tree (SKU VW-PAL-600) is quoted at 4–8 m for airports and transit concourses, against the 4–12 m height band this venue is engineered for. Footfall and sprinkler clearance drive the branch layout here.

Buying parameters for this venue

Reference SKUVW-PAL-600
Species height range4–8 m
Venue height band4–12 m
Base & fixingHoisted in pieces · Public-traffic rated bases
DocumentationFor VW-PAL-600: Public-traffic rated bases, weld inspection and load documentation available on request; NFPA 701 foliage available as an option.
Ficus project reference
Ficus project reference

Installation, materials & documentation

High-footfall schemes are engineered for bump contact: planter edges are chamfered, lower branch rings are fixed rather than free-hanging, and the crown is kept clear of sprinkler envelopes and wayfinding lines.

Large specimens are delivered knock-down with a rigging sequence and a lift plan for the contractor; the fire pack is formatted for a venue review committee that clears many decorative installations in one pass.

Buyer Questions

Ordering & Specification FAQs

What buyers ask when specifying king palms for airports and transit concourses — MOQ, lead time and this venue's requirements.

MOQ is project-based rather than per-SKU, and for king palms a single 4–8 m specimen is a realistic starting order — the canopy is fixed at 2.5–4 m unless you ask for a different crown. Quotation is built per tree and per project, so a single replacement palm and a full concourse scheme are both quoted the same way.

25–35 days for standard builds, and 45–60 days for custom builds. Lead time starts from approved drawings rather than from the enquiry. Crowns and trunks are packed separately and fronds are numbered for site assembly, so the assembly sequence has to be agreed with your crew before shipment.

Yes. Large builds are hoisted in manageable pieces through the finished space and assembled on site, with connection points hidden inside the structure.

Base-plate loading, anchoring method and connection details are issued as drawings, plus weld-inspection and load-test records for your authority.

Yes — 4–8 m, with the crown built to read correctly from upper floors and the fronds numbered at the factory so your crew can assemble the tree inside a finished building. Trunk finish, frond density and the base method are all drawn against your project; send the venue drawing and we return CAD options within 12 business hours.

Configure This Tree for Your Airports & Transit Concourses

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 12 business hours.

WhatsApp an Engineer All Solutions