Large Artificial Trees for Shopping Malls, Airports & Retail Atriums
Large-scale artificial trees for shopping malls, airports and retail atriums — specimens from 4 to 12 m with public-traffic rated bases and NFPA 701 foliage. Container-optimized packing keeps delivered cost down on multi-tree schemes.
Built for Malls & Commercial
Mall operators, airport authorities, retail developers and their fit-out contractors. You are specifying greenery for high-traffic public space where the tree has to look immaculate at year five, survive cleaning crews, and never become a maintenance line item on the ops budget.

Mall Atrium Palm Grove
A 12-palm grove built for a permanent retail atrium: 6 m trunks, weighted bases rated for public traffic and integrated uplighting hidden inside the planter ring.
From First Enquiry to Installation
Walk us through the scheme
Send the floor plan or atrium photos plus the venue type and traffic profile.
Spec & budget pack
We return sizes, quantities, CBM projection and a budget range the same day.
Sample & CAD approval
Physical sample or CAD options for sign-off, including structural drawings.
Staged delivery
Phased shipping matched to your fit-out schedule if the scheme opens in stages.
The Trees Malls & Commercial Specify Most
Sizes and finishes selected for malls & commercial requirements — mix and match within one project order.
Frequently Asked Questions
What malls & commercial ask us most often — MOQ, lead time, certification and site logistics.
From 4 m up to 12 m. Anything above the height that fits a container upright is engineered knock-down and assembled in place, with the assembly sequence documented for the rigging crew.
It depends on height, canopy spread and whether foliage ships flat-packed. We issue a piece-by-piece CBM packing sheet with every quotation so you can optimize the load before you commit to a quantity.
Yes. Bases are weighted and rated for public traffic, anchoring and connection details are issued as drawings, and load documentation accompanies every large build for your safety officer.
NFPA 701 fire-retardant foliage is standard. EN 13501 B-s1,d0 is available for EU projects, and test reports are archived against your order number.
Yes. We hold approved production and ship against your opening schedule, so the east wing does not sit in storage for six months waiting for the food court.
25–35 days for standard heights and 45–60 days for custom builds above 6 m, measured from approved drawings. Multi-tree schemes are confirmed against a phased delivery plan.
Send your floor plan or atrium photos
We return a size, quantity and CBM recommendation the same day.