Production & Lead Time, Documented per Project
“How long will the trees take, and can we hold you to a schedule written into the purchase order?”
Lead time is confirmed in writing in the quotation — it runs from approved drawings, not from the first enquiry, so there is no ambiguity about when the clock starts. Standard catalog models typically ship within 15–25 days after deposit; custom or large-scale trees above 6 m typically require 25–40 days depending on structure complexity and quantity.
The schedule is broken into milestones — frame building, trunk finishing, foliage assembly and final inspection — with photo updates at each stage. If your project has a hard handover date, the production plan is reverse-engineered from it and confirmed in the order.

Verifiable Facts Behind This Capability
- Standard models typically ship within 15–25 days after deposit
- Custom builds above 6 m typically 25–40 days, confirmed in the quotation
- Milestone photo updates at frame, trunk, foliage and final inspection stages
- Lead time runs from approved drawings — the trigger date is written into the order
- Container loading plans and document packs prepared in parallel with production
A Clear Path from Inquiry to Delivery
Share your requirements
Drawings, reference images, dimensions or site photos — over WhatsApp or the RFQ form.
Receive a technical proposal
Feasibility, material options and an itemized quotation, typically within 12 business hours.
Approve the spec
A 3D rendering or pre-production sample is provided for sign-off before mass production.
Track the build
Production runs with milestone photo updates at frame, trunk and foliage stages.
Inspect & ship
Final inspection, export packaging and shipment with a CBM packing plan per container.
Have a Project in Mind?
Tell us about your space, timeline and requirements. Our team typically responds within one business day with a technical proposal and quotation.