Mon–Sat 9:00–19:00 (UTC+8)
Industry Solution

Artificial Trees for Hotel Atriums, Lobbies & F&B Venues

We build commercial artificial trees for hotel and hospitality interiors — atrium specimens from 2 to 12 m, fire-rated to NFPA 701 as standard. Project-based MOQ, 25–35 day lead time, and installation supervised worldwide.

Who We Supply

Built for Hotels & Hospitality

Hotel groups, hospitality developers, F&B operators and interior fit-out contractors specifying greenery for lobbies, atriums, restaurants, ballrooms and pool decks. If your tree has to pass a fire inspection, survive an atrium's light load for a decade, and still look right in a guest's Instagram photo, this is the page for you.

01
Passes the fire marshal, not just the eye testNFPA 701 fire-retardant foliage is standard on every tree — not an upcharge. EN 13501 B-s1,d0 certification is available for EU hospitality projects, with batch test reports archived against your order number.
02
Atrium scale without atrium access problemsTrees above the size that fits a container upright are engineered knock-down and assembled on site. We issue the assembly sequence and rigging notes so your contractor is never guessing on install day.
03
Guest-proof constructionSteel-cored trunks with welded, galvanized reinforcement, weighted bases rated for public traffic, and foliage tested through SGS-accelerated weathering so a sunlit lobby does not fade your investment in eighteen months.
Artificial palms along the pool terrace of a beachfront resort at sunset
Recent Installation

Resort Pool Deck & Sunset Terrace

UV-stabilised palms delivered flat-packed, assembled on site and anchored into the pool surround — no irrigation, no leaf drop and no annual replanting budget.

Working with landscape architects?

How It Works

From First Enquiry to Installation

Step 1

Share the venue

Send reference photos, venue type and rough dimensions over WhatsApp or the RFQ form.

Step 2

Feasibility & budget

The engineering desk returns a feasibility answer and a budget range the same day.

Step 3

CAD approval

We develop CAD options for your approval before any production begins.

Step 4

Production & install

Build runs 25–35 days from approved drawings; installation is supervised on site.

Buyer Questions

Frequently Asked Questions

What hotels & hospitality ask us most often — MOQ, lead time, certification and site logistics.

Every tree ships with NFPA 701 fire-retardant foliage as standard, and we can supply EN 13501 B-s1,d0 for European projects. Batch test reports are archived against your order number, so your fire consultant can pull the documentation years later.

MOQ is project-based rather than per-SKU, and you can mix and match across catalog items in one order. A lobby scheme with three olive trees, two ficus and a palm counts as a single project order.

Yes. We build from 2 m up to 12 m. Above the size that ships upright in a container the tree is knocked down and assembled in place, with the sequence documented for your rigging crew.

25–35 days for standard heights and 45–60 days for custom builds above 6 m. Lead time runs from approved drawings rather than from the first enquiry, so plan the approval step into your fit-out schedule.

We ship worldwide with a piece-by-piece CBM packing sheet so your freight forwarder can plan the container. Supervised installation is available in most markets, and very large builds are assembled by our own crew.

Interior foliage uses non-toxic, RoHS-compliant pigments, and every outdoor-rated spec goes through SGS-accelerated weathering before it is offered. For glass atriums with high UV load, ask for the UV-treated foliage option.

Send your atrium photos and dimensions

The engineering desk replies the same day with feasibility and a budget range.

Request a Quote