Tree Planting for Your Hotel: Artificial Trees for Atriums, Lobbies & F&B Venues
We build commercial artificial trees for hotel and hospitality interiors — atrium specimens from 2 to 12 m, fire-rated to NFPA 701 available as an option. Project-based MOQ, 25–35 day lead time, and installation supervised worldwide.
Built for Hotels & Hospitality
Hotel groups, hospitality developers, F&B operators and interior fit-out contractors specifying greenery for lobbies, atriums, restaurants, ballrooms and pool decks. If your tree has to pass a fire inspection, survive an atrium's light load for a decade, and still look right in a guest's Instagram photo, this is the page for you.

Resort Pool Deck & Sunset Terrace
UV-stabilised palms delivered flat-packed, assembled on site and anchored into the pool surround — no irrigation, no leaf drop and no annual replanting budget.
From First Enquiry to Installation
Share the venue
Send reference photos, venue type and rough dimensions over WhatsApp or the RFQ form.
Feasibility & budget
The engineering desk returns a feasibility answer and a budget range the same day.
CAD approval
We develop CAD options for your approval before any production begins.
Production & install
Build runs 25–35 days from approved drawings; installation is supervised on site.
The Trees Hotels & Hospitality Specify Most
Sizes and finishes selected for hotels & hospitality requirements — mix and match within one project order.
Frequently Asked Questions
Procurement and design questions for lobbies, atriums, guest floors and outdoor grounds.
Double-height lobbies typically take 4–12 m feature trees such as banyan, ficus canopy or king palm, while guest floors and corridors use 1.5–3 m specimens. Heights are specified per the architectural drawing so the crown reads correctly from upper floors.
Yes. Exterior and balcony builds are engineered per site wind load and documented per project, with ballasted bases for decks or direct-bolt anchoring into concrete slabs. Salt-air safe fixings are specified for coastal resorts.
Fire-retardant foliage to NFPA 701 is available, with EN 13501 B-s1,d0 for EU projects and CA Title 19 for California. Certification documentation ships with the order for compliance sign-off.
Long specimens are braced on timber cradles and, above the size that fits a container upright, knocked down and assembled on site with the rigging sequence documented for your crew. Installations are scheduled around guest traffic.
Standard trees run about 1–3 weeks; bespoke builds and trees above 6 m typically take 45–60 days from approved drawings. Confirming the drawing turnaround early keeps the programme on track.
Yes. OEM production is available for distributors and own-brand programmes, with specification drawings held on file for repeat orders across properties.
Send your atrium photos and dimensions
The engineering desk replies the same day with feasibility and a budget range.