
Custom Artificial Atrium Ficus Tree for Airports & Transit Concourses
Application: Airports & Transit Concourses · Custom heights 6–12 m
We build custom artificial atrium ficus trees for airports and transit concourses — 6–12 m specimens, NFPA 701 fire-retardant as standard, engineered per project. Transit greenery is seen by millions, engineered for public safety and cleaned by crews on a schedule. We build specimens with weld-inspected structures and documented load ratings.
- Hoisted in manageable pieces through finished atriums
- Canopy spread to 14 m
- Base plate loading supplied for the structural package
Atrium Ficus Tree Build Spec
| Height Range | 6–12 m |
|---|---|
| Trunk Material | Galvanized steel core with sculpted fiberglass bark; connection points hidden inside the branching. |
| Foliage / Leaf Fabric | High-density PE foliage, fire-retardant as standard; UV-stabilised options for under-glass sites. |
| Planter & Base | Recessed planter well with drainage detail; base plate loading issued with the structural package. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | UV-stabilised foliage recommended under glass roofs; interior standard otherwise. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~3 pcs of 10 m atrium ficus per 40 ft HQ, knocked down for freight. |
| Typical Applications | Shopping malls, transport hubs, hotel atriums, exhibition halls. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What This Venue Needs
Sizing
Concourse specimens run 4–12 m, hoisted in pieces through finished builds and assembled on site for the largest installations.
Compliance & Anchoring
Public-traffic rated bases, weld inspection and load documentation standard; NFPA 701 foliage as standard.
Other Trees Specified for Airports & Transit Concourses
Other artificial trees specified for airports and transit concourses: King Palm Tree · Ficus Canopy Tree
Ordering & Specification FAQs
What buyers ask when specifying atrium ficus trees for airports and transit concourses — MOQ, lead time and this venue's requirements.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. Large builds are hoisted in manageable pieces through the finished space and assembled on site, with connection points hidden inside the structure.
Base-plate loading, anchoring method and connection details are issued as drawings, plus weld-inspection and load-test records for your authority.
Yes — 6–12 m with canopy spread to 14 m. Very large builds are hoisted in pieces through the finished atrium, and base plate loading is issued for your structural package.
Configure This Tree for Your Airports & Transit Concourses
Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 2 business hours.