
Artificial cherry blossom trees in Australia (Sydney & Melbourne)
Supplier: Australia (Sydney & Melbourne) · Custom heights 2–5 m
We supply artificial cherry blossom trees to Australia (Sydney & Melbourne) — custom heights 2–5 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Port Botany (Sydney) / Port of Melbourne, roughly 18-26 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Individually wired silk petals — crown arrives full
- White, blush or custom Pantone colour matching
- Single-stem and multi-stem forms
Cherry Blossom Tree — White Build Spec
| Height Range | 2–5 m |
|---|---|
| Trunk Material | Hand-shaped fiberglass trunk with natural bark texture. |
| Foliage / Leaf Fabric | Individually wired silk petals in white, blush or custom Pantone matching. |
| Planter & Base | White cast planter as shown, or a concealed base for planter-free installs. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | Outdoor-capable with the UV add-on; petals colour-set at the factory. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~20 pcs of 3 m blossom trees per 40 ft HQ. |
| Typical Applications | Hotel terraces, weddings, retail spring campaigns, photo sets. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying Australia (Sydney & Melbourne) Involves
Port & Transit
Main port: Port Botany (Sydney) / Port of Melbourne. Transit roughly 18-26 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
AS 1530.3 and AS/NZS 3837 supported for Australian fire compliance. Some of the highest UV in the world. Any outdoor or near-window placement must specify UV-stabilised foliage; interior placements need none.
Australia pairs extreme UV with strict biosecurity: timber packaging must be ISPM 15 compliant, so every crate we ship is heat-treated or fumigated and stamped. That is the difference between clearing the port and losing the container.
Other Artificial Trees We Ship to Australia (Sydney & Melbourne)
Other artificial trees we supply in Australia (Sydney & Melbourne): Autumn Maple Tree · Atrium Ficus Tree · Indoor Bonsai Pine · Pachira / Money Tree
Ordering & Shipping FAQs
What buyers ask when importing cherry blossom trees into Australia (Sydney & Melbourne) — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. Every crate is heat-treated or fumigated and stamped to ISPM 15, which is what Australian biosecurity requires for timber packaging. We have the stamp and documentation on every shipment.
Untreated foliage will fade. We specify UV-stabilised foliage with SGS-tested 3-5 year colour-fastness for any outdoor or near-window placement in Australia.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 2 business hours.
Get a Landed Quote for Australia (Sydney & Melbourne)
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.