
Artificial maple trees in Australia (Sydney & Melbourne)
Supplier: Australia (Sydney & Melbourne) · Custom heights 3–6 m
We supply artificial maple trees to Australia (Sydney & Melbourne) — custom heights 3–6 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Port Botany (Sydney) / Port of Melbourne, roughly 18-26 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Colour set at the factory, not dyed to fade
- No leaf drop onto product below
- Branching modelled on a mature Acer
Autumn Maple Tree Build Spec
| Height Range | 3–6 m |
|---|---|
| Trunk Material | Sculpted fiberglass trunk with branching modelled on mature Acer. |
| Foliage / Leaf Fabric | Colour-stable PE foliage in orange and red; colour set at the factory. |
| Planter & Base | Low cast planter, or a freestanding base plate. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | Interior standard; UV-stabilised foliage available. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~10 pcs of 4 m maples per 40 ft HQ. |
| Typical Applications | Showrooms, mall seasonal activations, photo and film sets, retail windows. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying Australia (Sydney & Melbourne) Involves
Port & Transit
Main port: Port Botany (Sydney) / Port of Melbourne. Transit roughly 18-26 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
AS 1530.3 and AS/NZS 3837 supported for Australian fire compliance. Some of the highest UV in the world. Any outdoor or near-window placement must specify UV-stabilised foliage; interior placements need none.
Australia pairs extreme UV with strict biosecurity: timber packaging must be ISPM 15 compliant, so every crate we ship is heat-treated or fumigated and stamped. That is the difference between clearing the port and losing the container.
Other Artificial Trees We Ship to Australia (Sydney & Melbourne)
Other artificial trees we supply in Australia (Sydney & Melbourne): Atrium Ficus Tree · Indoor Bonsai Pine · Pachira / Money Tree · Japanese Maple Tree
Ordering & Shipping FAQs
What buyers ask when importing maple trees into Australia (Sydney & Melbourne) — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. Every crate is heat-treated or fumigated and stamped to ISPM 15, which is what Australian biosecurity requires for timber packaging. We have the stamp and documentation on every shipment.
Untreated foliage will fade. We specify UV-stabilised foliage with SGS-tested 3-5 year colour-fastness for any outdoor or near-window placement in Australia.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 2 business hours.
Get a Landed Quote for Australia (Sydney & Melbourne)
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.