Mon–Sat 9:00–19:00 (UTC+8)

Artificial king palms in Singapore

Supplier: Singapore · Custom heights 4–8 m

We supply artificial king palms to Singapore — custom heights 4–8 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to PSA Singapore, roughly 7-12 days by sea from Yantian or Shenzhen, FOB or DDP on request.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
Technical Specifications

King Palm Tree Build Spec

Height Range4–8 m
Trunk MaterialFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
Foliage / Leaf FabricUV-treated PE fronds, pre-shaped and numbered at the factory for site assembly.
Planter & BaseCast planter or a recessed floor plate with concealed anchoring.
Fire Retardant ClassNFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects.
UV / Outdoor RatingCovered outdoor use: 3–5 years color-fastness with the UV add-on.
Wind ResistanceInterior rated as standard; exterior builds engineered per site wind-load and documented per project.
Packing & HandlingMost trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation.
Container Yield~9 pcs of 6 m king palms per 40 ft HQ — crowns packed separately from the trunks.
Typical ApplicationsShopping malls, airport concourses, hotel lobbies, resort colonnades.
Lead Time25–35 days for standard heights; 45–60 days for custom builds above 6 m.
MOQProject-based; mix-and-match across catalog SKUs.
CertificationsNFPA 701 · SGS UV · CE · RoHS · ISO 9001
Shipping & Compliance for Singapore

What Supplying Singapore Involves

Port & Transit

Main port: PSA Singapore. Transit roughly 7-12 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.

Certification & Climate

SCDF Fire Code compliance supported; SS 476 where specified. Tropical, humid year-round with high UV. Outdoor placements specify UV-stabilised, salt-air safe builds; interiors need no treatment.

Singapore is the shortest transit lane we run, which makes it practical to sample before committing. Its airport, mall and hotel work also runs to a very high finish standard, so we colour-match rather than ship a stock tone.

01
Shortest transit lane we runRoughly 7-12 days by sea, which makes sampling before a volume order genuinely practical rather than a scheduling exercise.
02
Colour-matched, not stock toneFoliage tone is matched to your reference sample, which matters on the high-finish airport, mall and hotel work Singapore is known for.
03
Tropical-ready outdoor buildsUV-stabilised, salt-air safe builds with stainless fixings for equatorial sun, humidity and rain.
Buyer Questions

Ordering & Shipping FAQs

What buyers ask when importing king palms into Singapore — MOQ, lead time, ports and local compliance.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Roughly 7-12 days by sea from Yantian or Shenzhen to PSA Singapore, which is our shortest lane. That makes sampling before a volume order practical.

Yes. SCDF Fire Code compliance is supported, with SS 476 where the specification requires it, and batch test reports archived against your order number.

Yes — 4–8 m, with the crown built to read correctly from upper floors and the fronds numbered at the factory so your crew can assemble the tree inside a finished building.

Get a Landed Quote for Singapore

Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.

WhatsApp an Engineer All Regions