
Artificial coconut palms in Singapore
Supplier: Singapore · Custom heights 3–7 m
We supply artificial coconut palms to Singapore — custom heights 3–7 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to PSA Singapore, roughly 7-12 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Salt-air safe build with stainless fixings
- UV-stabilised fronds, color-matched to natural coconut palm
- Ballasted base for decks, or direct-bolt anchoring
Coconut Palm Tree Build Spec
| Height Range | 3–7 m |
|---|---|
| Trunk Material | Fibreglass trunk in your choice of palm-ring density; stainless fixings specified for coastal sites. |
| Foliage / Leaf Fabric | UV-stabilised PE fronds, colour-matched to natural coconut palm. |
| Planter & Base | Ballasted base for decks and terraces, or direct-bolt anchoring into a concrete slab. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | SGS-tested 3–5 years color-fastness; salt-air safe. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~18 pcs of 4 m coconut palms per 40 ft HQ. |
| Typical Applications | Beach resorts, pool decks, water parks, coastal restaurants. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying Singapore Involves
Port & Transit
Main port: PSA Singapore. Transit roughly 7-12 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
SCDF Fire Code compliance supported; SS 476 where specified. Tropical, humid year-round with high UV. Outdoor placements specify UV-stabilised, salt-air safe builds; interiors need no treatment.
Singapore is the shortest transit lane we run, which makes it practical to sample before committing. Its airport, mall and hotel work also runs to a very high finish standard, so we colour-match rather than ship a stock tone.
Other Artificial Trees We Ship to Singapore
Other artificial trees we supply in Singapore: Ficus Canopy Tree · Date Palm Tree · Fan Palm & Rockery Planter · Banyan Statement Tree
Ordering & Shipping FAQs
What buyers ask when importing coconut palms into Singapore — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Roughly 7-12 days by sea from Yantian or Shenzhen to PSA Singapore, which is our shortest lane. That makes sampling before a volume order practical.
Yes. SCDF Fire Code compliance is supported, with SS 476 where the specification requires it, and batch test reports archived against your order number.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 2 business hours.
Get a Landed Quote for Singapore
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.