
Artificial event palms in Singapore
Supplier: Singapore · Custom heights 5–8 m
We supply artificial event palms to Singapore — custom heights 5–8 m, NFPA 701 foliage available as an option and UV-stabilised options for outdoor placement. Shipping to PSA Singapore, roughly 7-12 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Two-person lift weight for back-of-house moves
- Optional pre-installed festoon light channels
- Ballasted base for lawns, or a wheeled dolly
Event & Wedding Palms Build Spec
| Unit Size | 5–8 m, canopy 3–5 m |
|---|---|
| Height Range | 2–10 m (customizable to your photos or drawings) |
| Trunk | Lightweight fibreglass trunk on a steel core, built to be moved by two people. |
| Foliage | PE and PU materials; optional UV-resistant finish for outdoor use. |
| Base | Steel plate base — set in concrete or installed in a planter. |
| Fire Retardancy | Optional NFPA 701 / BS 5867. |
| Maintenance | No routine maintenance — no watering, feeding or leaf cleanup. |
| Lead Time | Standard builds 25–35 days; custom builds 45–60 days. |
What Supplying Singapore Involves
Port & Transit
Main port: PSA Singapore. Transit roughly 7-12 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
SCDF Fire Code compliance supported; SS 476 where specified. Tropical, humid year-round with high UV. Outdoor placements specify UV-stabilised, salt-air safe builds; interiors need no treatment.
Singapore is the shortest transit lane we run, which makes it practical to sample before committing. Its airport, mall and hotel work also runs to a very high finish standard, so we colour-match rather than ship a stock tone.
Other Artificial Trees We Ship to Singapore
Other artificial trees we supply in Singapore: Restaurant Feature Ficus · Cherry Blossom Tree — White · Autumn Maple Tree · Atrium Ficus Tree
Ordering & Shipping FAQs
What buyers ask when importing event palms into Singapore — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard builds, and 45–60 days for custom builds. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Roughly 7-12 days by sea from Yantian or Shenzhen to PSA Singapore, which is our shortest lane. That makes sampling before a volume order practical.
Yes. SCDF Fire Code compliance is supported, with SS 476 where the specification requires it, and batch test reports archived against your order number.
Yes. Heights run 5–8 m, the trunk is built to be moved by two people, and festoon light channels can be pre-installed at the factory.
Get a Landed Quote for Singapore
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 12 business hours.