Mon–Sat 9:00–19:00 (UTC+8)

Artificial event palms in Doha, Qatar

Supplier: Doha, Qatar · Custom heights 5–8 m

We supply artificial event palms to Doha, Qatar — custom heights 5–8 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Hamad Port, roughly 19-25 days by sea from Yantian or Shenzhen, FOB or DDP on request.

  • Two-person lift weight for back-of-house moves
  • Optional pre-installed festoon light channels
  • Ballasted base for lawns, or a wheeled dolly
Technical Specifications

Event & Wedding Palms Build Spec

Height Range5–8 m
Trunk MaterialLightweight fibreglass trunk on a steel core, built to be moved by two people.
Foliage / Leaf FabricUV-treated PE fronds; optional pre-installed festoon light channels.
Planter & BaseBallasted base for lawns and terraces, or a wheeled dolly for storage moves.
Fire Retardant ClassNFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects.
UV / Outdoor RatingSGS-tested 3–5 years color-fastness for repeated outdoor use.
Wind ResistanceInterior rated as standard; exterior builds engineered per site wind-load and documented per project.
Packing & HandlingMost trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation.
Container Yield~14 pcs of 6 m event palms per 40 ft HQ.
Typical ApplicationsWeddings, outdoor events, hotel terraces, vineyards, brand activations.
Lead Time25–35 days for standard heights; 45–60 days for custom builds above 6 m.
MOQProject-based; mix-and-match across catalog SKUs.
CertificationsNFPA 701 · SGS UV · CE · RoHS · ISO 9001
Shipping & Compliance for Doha, Qatar

What Supplying Doha, Qatar Involves

Port & Transit

Main port: Hamad Port. Transit roughly 19-25 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.

Certification & Climate

NFPA 701 as standard; Qatar Civil Defence and QCS-aligned documentation supported on request. Hot and humid on the coast with high UV. Outdoor placements specify UV-stabilised, salt-air safe builds.

Doha's stadium-legacy venues, malls and hotels are specifying greenery that has to hold up under coastal humidity and heavy footfall. We build salt-air safe, stainless-fixed specimens and document every load rating.

01
Salt-air safe on the Gulf coastStainless fixings and corrosion-resistant builds are specified for coastal exposure, not sold as a generic outdoor label.
02
Holds up under heavy footfallWeighted, anchoring-rated bases and weld-inspected connections, documented for your safety officer.
03
Fire documentation readyNFPA 701 is standard and Qatar Civil Defence documentation is supported, with batch reports archived against your order number.
Buyer Questions

Ordering & Shipping FAQs

What buyers ask when importing event palms into Doha, Qatar — MOQ, lead time, ports and local compliance.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Yes. We ship to Hamad Port, roughly 19-25 days by sea, and quote FOB or DDP. A CBM packing sheet ships with every quotation so your forwarder can plan the container in advance.

Yes. Coastal builds use stainless fixings and corrosion-resistant materials, and outdoor foliage is UV-stabilised with SGS-tested 3-5 year colour-fastness.

Yes. Heights run 5–8 m, the trunk is built to be moved by two people, and festoon light channels can be pre-installed at the factory.

Get a Landed Quote for Doha, Qatar

Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.

WhatsApp an Engineer All Regions