Custom Artificial Olive Builds from Reference Photos

Custom heights Made to order

For the jobs that do not fit a catalogue entry: a photographed tree to copy, a height set by a ceiling, a crown that has to clear a sprinkler line. Send the reference and the site constraints, and we return drawings against them.

  • Built from your reference photos, not a stock mould
  • UV-stabilised fronds, color-matched to natural coconut palm
  • Structural data issued with the drawing set
  • Sample swatches before production starts

Spec sheet (PDF) is generated per project configuration — request it via the quick RFQ and our engineers will attach it to your quotation.

Technical Specifications

Full Engineering Spec

ItemDescription
Unit SizeMade to order — dimensions per your drawings.
Height Range1–12 m (customizable to your photos or drawings)
TrunkNatural wood-grain molded bark sections, fiberglass, steel structure and galvanized steel frame.
FoliagePE and PU materials; optional UV-resistant finish for outdoor use.
BaseSteel plate base — set in concrete or installed in a planter.
Fire RetardancyOptional NFPA 701 / BS 5867.
MaintenanceNo routine maintenance — no watering, feeding or leaf cleanup.
Lead TimeStandard builds 7–15 days; custom builds 20–45 days.
Recommended Applications

Where Buyers Specify the Custom Olive Builds

Each page below covers this tree type in that venue category — codes, ceiling heights and the anchoring each space calls for.

Buyer Questions

Ordering & Specification FAQs

The five questions that come up most often on this specification, answered against the actual build.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 12 business hours.

7–15 days once drawings are approved; the drawing turnaround is the part to lock early. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage is flat-packed and planters nest to cut volume. A piece-by-piece CBM packing sheet ships with every quotation, so you can price the container before you commit.

Yes — this is what the page is for. Send reference photos with a scale, the ceiling height and the fixing constraints, and we return a drawing set with the options priced.

Configure This Tree for Your Project

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 12 business hours.

WhatsApp an Engineer See Installed Projects