Mon–Sat 9:00–19:00 (UTC+8)

Custom Artificial King Palm Tree for Plazas & Streetscapes

Application: Plazas & Streetscapes · Custom heights 4–8 m

We build custom artificial king palms for plazas and streetscapes — 4–8 m specimens, NFPA 701 fire-retardant treatment available as an option, engineered per project. Streetscape trees face wind, pollution and public contact year-round. We build UV-stabilised, salt-air safe specimens engineered for exterior wind load and documented per project.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
Technical Specifications

King Palm Tree Build Spec

Unit Size4–8 m, canopy 2.5–4 m
Height Range2–12 m (customizable to your photos or drawings)
TrunkFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
FoliagePE and PU materials; optional UV-resistant finish for outdoor use.
BaseSteel plate base — set in concrete or installed in a planter.
Fire RetardancyOptional NFPA 701 / BS 5867.
MaintenanceNo routine maintenance — no watering, feeding or leaf cleanup.
Lead TimeStandard builds 25–35 days; custom builds 45–60 days.
Sizing & Compliance for Plazas & Streetscapes

What This Venue Needs

Sizing

Streetscape specimens run 4–9 m on galvanised steel cores, with anchored bases for pavements and planters.

Compliance & Anchoring

Exterior builds engineered per site wind load; UV-stabilised foliage SGS-tested 3–5 years; salt-air safe fixings.

Project Specification

King Palm Tree specified for Plazas & Streetscapes

King Palm Tree (SKU VW-PAL-600) is quoted at 4–8 m for plazas and streetscapes, against the 4–9 m height band this venue is engineered for. Footfall and sprinkler clearance drive the branch layout here.

Buying parameters for this venue

Reference SKUVW-PAL-600
Species height range4–8 m
Venue height band4–9 m
Base & fixingAnchored bases · Galvanised steel cores
DocumentationFor VW-PAL-600: Exterior builds engineered per site wind load; UV-stabilised foliage SGS-tested 3–5 years; salt-air safe fixings.
Lifting a trunk section in the workshop
Lifting a trunk section in the workshop

Installation, materials & documentation

High-footfall schemes are engineered for bump contact: planter edges are chamfered, lower branch rings are fixed rather than free-hanging, and the crown is kept clear of sprinkler envelopes and wayfinding lines.

Large specimens are delivered knock-down with a rigging sequence and a lift plan for the contractor; the fire pack is formatted for a venue review committee that clears many decorative installations in one pass.

Buyer Questions

Ordering & Specification FAQs

What buyers ask when specifying king palms for plazas and streetscapes — MOQ, lead time and this venue's requirements.

MOQ is project-based rather than per-SKU, and for king palms a single 4–8 m specimen is a realistic starting order — the canopy is fixed at 2.5–4 m unless you ask for a different crown. Quotation is built per tree and per project, so a single replacement palm and a full concourse scheme are both quoted the same way.

25–35 days for standard builds, and 45–60 days for custom builds. Lead time starts from approved drawings rather than from the enquiry. Crowns and trunks are packed separately and fronds are numbered for site assembly, so the assembly sequence has to be agreed with your crew before shipment.

Yes. Exterior builds are engineered against your project's wind load and documented per project, not sold with a generic outdoor label.

Direct-bolt anchoring into the pavement or a concealed planter base, with the method drawn for your structural engineer.

Yes — 4–8 m, with the crown built to read correctly from upper floors and the fronds numbered at the factory so your crew can assemble the tree inside a finished building. Trunk finish, frond density and the base method are all drawn against your project; send the venue drawing and we return CAD options within 12 business hours.

Configure This Tree for Your Plazas & Streetscapes

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 12 business hours.

WhatsApp an Engineer All Solutions