
Artificial Japanese maple trees in United States (Los Angeles & New York)
Supplier: United States (Los Angeles & New York) · Custom heights 1.8–4 m
We supply artificial Japanese maple trees to United States (Los Angeles & New York) — custom heights 1.8–4 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Los Angeles-Long Beach / New York-New Jersey, roughly 18-28 days by sea, faster to the West Coast, FOB or DDP on request.
- Matched sets for corridors and reception rows
- Trunk lean set to your scheme, or kept plumb for pairs
- Multi-tone foliage blending available
Japanese Maple Tree Build Spec
| Height Range | 1.8–4 m |
|---|---|
| Trunk Material | Sculpted fiberglass trunk, set to a specified lean or kept vertical for matched pairs. |
| Foliage / Leaf Fabric | Layered PE foliage in seasonal tones; multi-tone blending available. |
| Planter & Base | White cube planters as shown, or a planter bed built into the floor finish. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | Interior standard. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~24 pcs of 2.5 m maples per 40 ft HQ. |
| Typical Applications | Reception halls, fine dining, spa and wellness, brand showrooms. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying United States (Los Angeles & New York) Involves
Port & Transit
Main port: Los Angeles-Long Beach / New York-New Jersey. Transit roughly 18-28 days by sea, faster to the West Coast. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
NFPA 701 as standard; CAL 117 / TB 117 supported for California projects. Varies sharply by state. The Southwest and Florida carry high UV and need UV-stabilised foliage outdoors; most interiors need no treatment at all.
US buyers are container-economics driven: landed cost per tree matters more than unit price. We flat-pack foliage and nest planters to raise container yield, and quote FOB or DDP into your nearest port.
Other Artificial Trees We Ship to United States (Los Angeles & New York)
Other artificial trees we supply in United States (Los Angeles & New York): Mediterranean Olive Tree · King Palm Tree · Coconut Palm Tree · Ficus Canopy Tree
Ordering & Shipping FAQs
What buyers ask when importing Japanese maple trees into United States (Los Angeles & New York) — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
We ship FOB or DDP into Los Angeles-Long Beach or New York-New Jersey, roughly 18-28 days by sea and faster to the West Coast. A CBM packing sheet ships with every quotation so you can plan the container load.
NFPA 701 fire-retardant foliage is standard, and CAL 117 / TB 117 is supported for California projects. Batch test reports are archived against your order number for later retrieval.
Yes — 1.8–4 m, with the trunk lean set to your scheme or kept plumb for matched pairs, and multi-tone foliage blending available.
Get a Landed Quote for United States (Los Angeles & New York)
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.