
Artificial fruit trees in London, United Kingdom
Supplier: London, United Kingdom · Custom heights 2–5 m
We supply artificial fruit trees to London, United Kingdom — custom heights 2–5 m, NFPA 701 foliage available as an option and UV-stabilised options for outdoor placement. Shipping to Felixstowe / London Gateway, roughly 28-35 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Hand-set fruit, colour-matched across the order
- Apple, citrus, cherry, peach and mixed-fruit crowns
- fire-retardant foliage available as an option
Artificial Fruit Tree Build Spec
| Unit Size | 2–5 m, canopy 1.5–3.5 m |
|---|---|
| Height Range | 1–8 m (customizable to your photos or drawings) |
| Trunk | Steel-cored fibreglass trunk, hand-sculpted and bark-textured. |
| Foliage | PE and PU materials; optional UV-resistant finish for outdoor use. |
| Base | Steel plate base — set in concrete or installed in a planter. |
| Fire Retardancy | Optional NFPA 701 / BS 5867. |
| Maintenance | No routine maintenance — no watering, feeding or leaf cleanup. |
| Lead Time | Standard builds 7–15 days; custom builds 20–45 days. |
What Supplying London, United Kingdom Involves
Port & Transit
Main port: Felixstowe / London Gateway. Transit roughly 28-35 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
BS 5852 and EN 13501 B-s1,d0 supported; UKCA / CE marking documentation supplied. Temperate with low UV. Interior foliage needs no UV treatment at all; covered outdoor terraces are fine with standard build.
London fit-out work is documentation-heavy and often inside heritage or listed shells with tight access. We issue base-plate loading and anchoring drawings your structural engineer can sign, and knock down large trees so they pass through a doorway instead of a hoist.
London fruit trees: restaurant floors and retail windows
London restaurants use fruit trees as table-adjacent scenery, which puts them at hand height for guests, so the fruit anchors and branch tips for this market are specified for constant touch: no sharp collar edges, no glue lines where a thumbnail can catch. Retail window teams in Covent Garden and Knightsbridge order the same trees for seasonal displays and restage them weekly.
Delivery through City loading docks runs on morning slots before service, so crowns and trunks ship as pre-labeled units a two-person floor crew can assemble in ninety minutes. The foliage batch carries its fire report in the format London officers expect, tucked in a sleeve inside the crate.
Other Artificial Trees We Ship to London, United Kingdom
Other artificial trees we supply in London, United Kingdom: Mediterranean Olive Tree · King Palm Tree · Coconut Palm Tree · Ficus Canopy Tree
Ordering & Shipping FAQs
What buyers ask when importing fruit trees into London, United Kingdom — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
7–15 days for standard builds, and 20–45 days for custom builds. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. We ship to Felixstowe or London Gateway, roughly 28-35 days by sea, on FOB or DDP terms. Production runs 25-35 days from approved drawings, so plan the approval step into your fit-out programme.
BS 5852 and EN 13501 B-s1,d0 are supported, with UKCA or CE marking documentation supplied. Batch test reports are archived against your order number for later retrieval.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 12 business hours.
Get a Landed Quote for London, United Kingdom
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 12 business hours.