Mon–Sat 9:00–19:00 (UTC+8)

Artificial banyan trees in Dubai, UAE

Supplier: Dubai, UAE · Custom heights 4–10 m

We supply artificial banyan trees to Dubai, UAE — custom heights 4–10 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Jebel Ali, roughly 18-24 days by sea from Yantian or Shenzhen, FOB or DDP on request.

  • Aerial-root detailing cast into the trunk
  • Canopy spread to 12 m
  • Layered foliage tiers, fire-retardant as standard
Technical Specifications

Banyan Statement Tree Build Spec

Height Range4–10 m
Trunk MaterialSculpted fiberglass bark over galvanized steel; aerial-root detailing integral to the trunk casting.
Foliage / Leaf FabricDense PE foliage in layered tiers; fire-retardant as standard.
Planter & BaseRecessed planter well or freestanding base plate; structural anchoring documented for the engineer.
Fire Retardant ClassNFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects.
UV / Outdoor RatingInterior standard; UV-stabilised foliage available under glass roofs.
Wind ResistanceInterior rated as standard; exterior builds engineered per site wind-load and documented per project.
Packing & HandlingMost trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation.
Container Yield~4 pcs of 8 m banyan per 40 ft HQ, knocked down for freight.
Typical ApplicationsHotel atriums, shopping malls, cultural venues, headquarters lobbies.
Lead Time25–35 days for standard heights; 45–60 days for custom builds above 6 m.
MOQProject-based; mix-and-match across catalog SKUs.
CertificationsNFPA 701 · SGS UV · CE · RoHS · ISO 9001
Shipping & Compliance for Dubai, UAE

What Supplying Dubai, UAE Involves

Port & Transit

Main port: Jebel Ali. Transit roughly 18-24 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.

Certification & Climate

NFPA 701 foliage as standard; EN 13501 B-s1,d0 and UAE Civil Defence documentation available on request. Extreme summer heat and very high UV. Outdoor and glass-atrium placements must specify UV-stabilised foliage; fully air-conditioned interiors need no treatment at all.

Dubai's hospitality, mall and airport pipeline runs on tight fit-out windows and high-spec finishes. We quote DDP into Jebel Ali as readily as FOB, and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.

01
DDP into Jebel Ali, not just FOBWe quote delivered-duty-paid as readily as FOB, so your landed cost is known before you commit rather than after the vessel sails.
02
Built for extreme UVFoliage for outdoor and glass-atrium placement is UV-stabilised and SGS-tested for 3-5 year colour-fastness, because untreated leaves fade fast under Gulf sun.
03
Documentation for Civil DefenceNFPA 701 is standard and EN 13501 B-s1,d0 is available, with batch test reports archived against your order number for your fire consultant.
Buyer Questions

Ordering & Shipping FAQs

What buyers ask when importing banyan trees into Dubai, UAE — MOQ, lead time, ports and local compliance.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Yes. We ship to Jebel Ali and onward across the UAE, quoting FOB or DDP depending on how you handle customs. Transit is roughly 18-24 days by sea from Yantian or Shenzhen, and a piece-by-piece CBM packing sheet ships with every quotation.

NFPA 701 fire-retardant foliage is standard, and EN 13501 B-s1,d0 can be supplied for projects that specify it. Batch test reports are archived against your order number so your fire consultant can retrieve them later.

Yes — 4–10 m with canopy spread to 12 m. Above the scale that fits a container upright, the tree is knocked down and assembled on site, with the sequence documented for your rigging crew.

Get a Landed Quote for Dubai, UAE

Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.

WhatsApp an Engineer All Regions