Mon–Sat 9:00–19:00 (UTC+8)

Artificial king palms in Canada (Toronto & Vancouver)

Supplier: Canada (Toronto & Vancouver) · Custom heights 4–8 m

We supply artificial king palms to Canada (Toronto & Vancouver) — custom heights 4–8 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Vancouver / Montreal, roughly 22-32 days by sea from Yantian or Shenzhen, FOB or DDP on request.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
Technical Specifications

King Palm Tree Build Spec

Height Range4–8 m
Trunk MaterialFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
Foliage / Leaf FabricUV-treated PE fronds, pre-shaped and numbered at the factory for site assembly.
Planter & BaseCast planter or a recessed floor plate with concealed anchoring.
Fire Retardant ClassNFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects.
UV / Outdoor RatingCovered outdoor use: 3–5 years color-fastness with the UV add-on.
Wind ResistanceInterior rated as standard; exterior builds engineered per site wind-load and documented per project.
Packing & HandlingMost trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation.
Container Yield~9 pcs of 6 m king palms per 40 ft HQ — crowns packed separately from the trunks.
Typical ApplicationsShopping malls, airport concourses, hotel lobbies, resort colonnades.
Lead Time25–35 days for standard heights; 45–60 days for custom builds above 6 m.
MOQProject-based; mix-and-match across catalog SKUs.
CertificationsNFPA 701 · SGS UV · CE · RoHS · ISO 9001
Shipping & Compliance for Canada (Toronto & Vancouver)

What Supplying Canada (Toronto & Vancouver) Involves

Port & Transit

Main port: Vancouver / Montreal. Transit roughly 22-32 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.

Certification & Climate

NFPA 701 as standard; CAN/ULC-S102 supported for Canadian projects. Cold winters and dry, heated interiors. No UV treatment is needed indoors; outdoor placements specify UV-stabilised foliage that also handles freeze-thaw.

Canadian interiors are heated and dry for months at a time, which is exactly where real planting fails and artificial does not. We build for that environment and document to Canadian fire classifications.

01
Built for dry, heated interiorsNo watering, no humidity requirement and no leaf drop through a long heating season, which is where live planting fails.
02
Canadian fire classificationsNFPA 701 is standard and CAN/ULC-S102 is supported, with batch test reports archived against your order number.
03
Two-coast port accessWe ship into Vancouver or Montreal depending on your project location, FOB or DDP, with a CBM packing sheet on every quotation.
Buyer Questions

Ordering & Shipping FAQs

What buyers ask when importing king palms into Canada (Toronto & Vancouver) — MOQ, lead time, ports and local compliance.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Yes. We ship into Vancouver or Montreal, roughly 22-32 days by sea, on FOB or DDP terms, with a piece-by-piece CBM packing sheet supplied with every quotation.

NFPA 701 fire-retardant foliage is standard and CAN/ULC-S102 is supported for Canadian projects, with batch test reports archived against your order number.

Yes — 4–8 m, with the crown built to read correctly from upper floors and the fronds numbered at the factory so your crew can assemble the tree inside a finished building.

Get a Landed Quote for Canada (Toronto & Vancouver)

Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.

WhatsApp an Engineer All Regions