
Artificial maple trees in Germany (Berlin, Frankfurt, Munich)
Supplier: Germany (Berlin, Frankfurt, Munich) · Custom heights 3–6 m
We supply artificial maple trees to Germany (Berlin, Frankfurt, Munich) — custom heights 3–6 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Hamburg, roughly 30-38 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Colour set at the factory, not dyed to fade
- No leaf drop onto product below
- Branching modelled on a mature Acer
Autumn Maple Tree Build Spec
| Height Range | 3–6 m |
|---|---|
| Trunk Material | Sculpted fiberglass trunk with branching modelled on mature Acer. |
| Foliage / Leaf Fabric | Colour-stable PE foliage in orange and red; colour set at the factory. |
| Planter & Base | Low cast planter, or a freestanding base plate. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | Interior standard; UV-stabilised foliage available. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~10 pcs of 4 m maples per 40 ft HQ. |
| Typical Applications | Showrooms, mall seasonal activations, photo and film sets, retail windows. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying Germany (Berlin, Frankfurt, Munich) Involves
Port & Transit
Main port: Hamburg. Transit roughly 30-38 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
EN 13501 B-s1,d0 as standard for EU projects; DIN 4102 legacy classifications supported; CE marked. Temperate with moderate UV. Interior foliage needs no UV treatment; outdoor placements use UV-stabilised foliage for German winters and summer sun alike.
German specification culture expects a document for every claim. We respond point by point to a specification with what we meet, what we can vary and what needs an exception, so your RFI process stays clean.
Other Artificial Trees We Ship to Germany (Berlin, Frankfurt, Munich)
Other artificial trees we supply in Germany (Berlin, Frankfurt, Munich): Atrium Ficus Tree · Indoor Bonsai Pine · Pachira / Money Tree · Japanese Maple Tree
Ordering & Shipping FAQs
What buyers ask when importing maple trees into Germany (Berlin, Frankfurt, Munich) — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. Send the specification and we respond point by point with what we meet, what we can vary and what needs an exception, so your RFI process stays clean.
EN 13501 B-s1,d0 is supported for EU projects, with DIN 4102 legacy classifications where the specification still references them, plus CE marking across the range.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 2 business hours.
Get a Landed Quote for Germany (Berlin, Frankfurt, Munich)
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.