
Artificial fan palms in London, United Kingdom
Supplier: London, United Kingdom · Custom heights 2–5 m
We supply artificial fan palms to London, United Kingdom — custom heights 2–5 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Felixstowe / London Gateway, roughly 28-35 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Multi-stem fan palm cluster with underplanting
- Rockery bed delivered in modular sections
- Boxwood and mixed foliage set at the factory
Fan Palm & Rockery Planter Build Spec
| Height Range | 2–5 m |
|---|---|
| Trunk Material | Slender fibreglass trunks in multi-stem clusters. |
| Foliage / Leaf Fabric | PE fan fronds plus mixed underplanting and boxwood balls. |
| Planter & Base | Rockery bed on a concealed base, delivered in modular sections for lift access. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | Interior standard; UV-stabilised foliage available under glass. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | Bed assemblies pack flat; ~12 planters per 40 ft HQ. |
| Typical Applications | Hotel interiors, glass atriums, spa and wellness areas, office reception. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying London, United Kingdom Involves
Port & Transit
Main port: Felixstowe / London Gateway. Transit roughly 28-35 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
BS 5852 and EN 13501 B-s1,d0 supported; UKCA / CE marking documentation supplied. Temperate with low UV. Interior foliage needs no UV treatment at all; covered outdoor terraces are fine with standard build.
London fit-out work is documentation-heavy and often inside heritage or listed shells with tight access. We issue base-plate loading and anchoring drawings your structural engineer can sign, and knock down large trees so they pass through a doorway instead of a hoist.
Other Artificial Trees We Ship to London, United Kingdom
Other artificial trees we supply in London, United Kingdom: Banyan Statement Tree · Event & Wedding Palms · Restaurant Feature Ficus · Cherry Blossom Tree — White
Ordering & Shipping FAQs
What buyers ask when importing fan palms into London, United Kingdom — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. We ship to Felixstowe or London Gateway, roughly 28-35 days by sea, on FOB or DDP terms. Production runs 25-35 days from approved drawings, so plan the approval step into your fit-out programme.
BS 5852 and EN 13501 B-s1,d0 are supported, with UKCA or CE marking documentation supplied. Batch test reports are archived against your order number for later retrieval.
Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 2 business hours.
Get a Landed Quote for London, United Kingdom
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.