
Artificial atrium ficus trees in Malaysia (Kuala Lumpur)
Supplier: Malaysia (Kuala Lumpur) · Custom heights 6–12 m
We supply artificial atrium ficus trees to Malaysia (Kuala Lumpur) — custom heights 6–12 m, NFPA 701 foliage as standard and UV-stabilised options for outdoor placement. Shipping to Port Klang, roughly 8-14 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Hoisted in manageable pieces through finished atriums
- Canopy spread to 14 m
- Base plate loading supplied for the structural package
Atrium Ficus Tree Build Spec
| Height Range | 6–12 m |
|---|---|
| Trunk Material | Galvanized steel core with sculpted fiberglass bark; connection points hidden inside the branching. |
| Foliage / Leaf Fabric | High-density PE foliage, fire-retardant as standard; UV-stabilised options for under-glass sites. |
| Planter & Base | Recessed planter well with drainage detail; base plate loading issued with the structural package. |
| Fire Retardant Class | NFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects. |
| UV / Outdoor Rating | UV-stabilised foliage recommended under glass roofs; interior standard otherwise. |
| Wind Resistance | Interior rated as standard; exterior builds engineered per site wind-load and documented per project. |
| Packing & Handling | Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation. |
| Container Yield | ~3 pcs of 10 m atrium ficus per 40 ft HQ, knocked down for freight. |
| Typical Applications | Shopping malls, transport hubs, hotel atriums, exhibition halls. |
| Lead Time | 25–35 days for standard heights; 45–60 days for custom builds above 6 m. |
| MOQ | Project-based; mix-and-match across catalog SKUs. |
| Certifications | NFPA 701 · SGS UV · CE · RoHS · ISO 9001 |
What Supplying Malaysia (Kuala Lumpur) Involves
Port & Transit
Main port: Port Klang. Transit roughly 8-14 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
Jabatan Bomba (Fire and Rescue Department) approval supported; MS 1073 where specified. Tropical and humid with high UV and heavy rain. Outdoor placements specify UV-stabilised, salt-air safe builds with drainage-aware bases.
KL's mall, hotel and resort work sits in constant humidity, so planters and bases are specified to drain rather than trap water. We build sealed, self-contained bases that will not stain a finished floor.
Other Artificial Trees We Ship to Malaysia (Kuala Lumpur)
Other artificial trees we supply in Malaysia (Kuala Lumpur): Indoor Bonsai Pine · Pachira / Money Tree · Japanese Maple Tree · Mediterranean Olive Tree
Ordering & Shipping FAQs
What buyers ask when importing atrium ficus trees into Malaysia (Kuala Lumpur) — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
25–35 days for standard heights, and 45–60 days for custom builds above 6 m. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. Transit is roughly 8-14 days by sea from Yantian or Shenzhen, on FOB or DDP terms, with a piece-by-piece CBM packing sheet supplied with every quotation.
No. Bases are sealed and self-contained, and outdoor builds are specified to drain rather than trap water, so nothing reaches a polished floor.
Yes — 6–12 m with canopy spread to 14 m. Very large builds are hoisted in pieces through the finished atrium, and base plate loading is issued for your structural package.
Get a Landed Quote for Malaysia (Kuala Lumpur)
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 2 business hours.